Context
Implementation of the SRAP System in multiple photovoltaic portfolios
As part of the modernization of several low-power photovoltaic plants (between 2 and 10 MW), Clervin promoted the implementation of a SRAP system adapted to the technical and economic needs of each asset, ensuring its correct integration with Red Eléctrica de España (REE).
The challenge
The facilities had limitations due to obsolete engineering, which made it difficult to adapt to the requirements of the SRAP system. It was necessary to find a solution that combined technical feasibility and economic sustainability.
"Technical limitations for integration into SRAP."
The solution
An individualized technical study was developed for each plant, identifying its particularities and needs. Based on this diagnosis, engineering modifications were implemented that allowed the integration of an optimized SRAP system, complying with current regulations and adapting to the economic model of each asset.
"An optimized SRAP tailored to each plant."
The results
- Successful integration of assets into REE's SRAP system.
- Successful completion of the performance tests.
- Approximate 40% savings in production costs, without compromising reliability or regulatory compliance.
"40% savings in production costs without losing reliability."
"Engineering modifications that enabled the integration of an optimized SRAP system."